{"id":404,"date":"2020-09-25T15:09:20","date_gmt":"2020-09-25T09:39:20","guid":{"rendered":"https:\/\/scholarsclasses.com\/blog\/?p=404"},"modified":"2025-12-27T17:53:52","modified_gmt":"2025-12-27T12:23:52","slug":"gantt-task-and-bonus-plan","status":"publish","type":"post","link":"https:\/\/scholarsclasses.com\/blog\/gantt-task-and-bonus-plan\/","title":{"rendered":"Gantt Task and Bonus Plan | Free Cost Accounting Articles"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-text-align-center\">Gantt Task and Bonus Plan<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is Gantt task and bonus plan?<\/h3>\n\n\n\n<p><strong><em>This plan is called the <a href=\"https:\/\/scholarsclasses.com\/blog\/gantt-task-and-bonus-plan\/\" data-type=\"URL\" data-id=\"https:\/\/scholarsclasses.com\/blog\/gantt-task-and-bonus-plan\/\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt task<\/a> and Premium plan given by H.L. Gantt. In this method, workers are guaranteed wages as per the determined time. The quantity of production to be done by the group is decided.<\/em><\/strong><\/p>\n\n\n\n<p>The Gantt task and bonus plan is a cross between time wages and piece work. This system aims to eliminate the jump in the Taylor system and to bring in the Halsey system. <\/p>\n\n\n\n<p>The system is expressed in terms of time wages with a set standard. For reaching the standard or task a 20% bonus was given and above it, Piece rates are paid. Time wages are guaranteed and this prevents discouraging the new workers, and also prevents the elimination of the poorer worker. <\/p>\n\n\n\n<p>Yet each man should have a job equal to his capacity. It is not the function of a wage payment plan to keep poor workers from being discharged. The essence of this plan is to set a fairly high standard for average performance, or task, on each job, guaranteed time wages being paid up to that point, but for production, at a task, a bonus of 20% is paid, and above it, piece rates are paid or stepped-up<br>scale.<\/p>\n\n\n\n<p>Only those workers who reach this specified standard or task will receive a high rate. It is to be seen that the setting of this standard is going to be difficult and to do it Taylor&#8217;s time studies were introduced.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-regular\"><table><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>PERFORMANCE<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>EARNINGS<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Output below standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">Time rate (Guaranteed)<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Output at standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">120% of Normal rate or<br>20% Bonus of time or Piece Rate<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">Output above standard<\/td><td class=\"has-text-align-center\" data-align=\"center\">High Piece Rate or<br>120% of Piece rate<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-src=\"https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-1024x576.jpg\" alt=\"Gantt Task and Bonus Plan\" class=\"wp-image-9634 lazyload\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;width:768px;height:432px\" title=\"\" data-srcset=\"https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-1024x576.jpg 1024w, https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-300x169.jpg 300w, https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-768x432.jpg 768w, https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-1536x864.jpg 1536w, https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan-640x360.jpg 640w, https:\/\/scholarsclasses.com\/blog\/wp-content\/uploads\/2021\/10\/Gantt-Task-and-Bonus-Plan.jpg 1920w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" \/><\/figure>\n\n\n\n<p><strong>Solved example of <a href=\"https:\/\/youtu.be\/uvV0AWyYeSo\" data-type=\"URL\" data-id=\"https:\/\/youtu.be\/uvV0AWyYeSo\" target=\"_blank\" rel=\"noreferrer noopener\">Gantt Task and Bonus Plan<\/a><\/strong><\/p>\n\n\n\n<p>Standard Rate &#8211; Rs. 5 Per Hour<br>Standard hours for the job &#8211; 8 Hours<br>Bonus &#8211; 20% of Standard Time<br>Worker A completes work in &#8211; 10 Hours<br>Worker B completes work in &#8211; 8 Hours<br>Worker C completes work in &#8211; 6 Hours<\/p>\n\n\n\n<p>Compare the earnings of A, B, and C under the Gantt Task and Bonus Plan.<\/p>\n\n\n\n<p><strong>Solution:<\/strong><\/p>\n\n\n\n<p>Wages of worker A,<br> = 10 hrs x Rs 5 = Rs 50<\/p>\n\n\n\n<p>Wages of worker B,<br>=  8 hrs x Rs 5 + 20% of 40 <br>= Rs 40 + 8 = 48<\/p>\n\n\n\n<p>Wages of worker C,<br>=  8 hrs x Rs 5 + 20% of 40 <br>= Rs 40 + 8 = 48<\/p>\n\n\n\n<p>A&#8217;s Earning per hour = 50\/10  = Rs 5<br>B&#8217;s Earning per hour = 48\/8    = Rs 6<br>C&#8217;s Earning per hour = 48\/6    = Rs 8<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-regular\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/inventory-turnover-ratio-formula\/\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/inventory-turnover-ratio-formula\/\">Inventory Turnover<\/a><\/td><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/labour-cost\/\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/labour-cost\/\">Labour Cost <\/a><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/overheads-cost-accounting\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/overheads-cost-accounting\/\" rel=\"noreferrer noopener\">Overheads<\/a><\/td><td class=\"has-text-align-center\" data-align=\"center\"><span style=\"color:#fc0505\" class=\"has-inline-color\"><a href=\"https:\/\/scholarsclasses.com\/blog\/material-cost-tybcom\/\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/material-cost-tybcom\/\">Material Cost&nbsp;<\/a><\/span><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/stock-levels\/\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/stock-levels\/\">Stock Levels<\/a><\/td><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/variance-analysis-labour-variances\/\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/variance-analysis-labour-variances\/\">Labour Variances \u2013 Standard Costing<\/a><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/rowan-premium-plan-labour-cost\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/scholarsclasses.com\/blog\/rowan-premium-plan-labour-cost\/\" rel=\"noreferrer noopener\">Rowan Premium Plan<\/a><\/td><td class=\"has-text-align-center\" data-align=\"center\"><a href=\"https:\/\/scholarsclasses.com\/blog\/standard-costing-material-variance\/\" target=\"_blank\" rel=\"noreferrer noopener\">Standard Costing \u2013 Material Variance<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":9634,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[2,10],"tags":[149],"class_list":["post-404","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bcom","category-educational-blogs","tag-gantt-task-bonus-plan"],"_links":{"self":[{"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/posts\/404","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/comments?post=404"}],"version-history":[{"count":14,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/posts\/404\/revisions"}],"predecessor-version":[{"id":41786,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/posts\/404\/revisions\/41786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/media\/9634"}],"wp:attachment":[{"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/media?parent=404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/categories?post=404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/scholarsclasses.com\/blog\/wp-json\/wp\/v2\/tags?post=404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}